The NIPP projects has a total concrete volume of over 50,000 cubic metres, in ecxess of 6,200 tonnes of steel reinforcement and about 1,800 tonnes of structural steelwork.
Project Scope: Civil Works Subcontractor to Marubeni Corporation, Japan. The project comprised of a total concrete volume of 15,200 cubic metres, 2100 tonnes of steel reinforcement bars and 900 tonnes of structural steel erection. These were used for the construction of the following aspects of the work:
a. 5 number Gas Turbine generator pedestals/foundation with all associated foundations for transformer, exhaust stack and fire wall
b. Central control building with basement, ground and one upper floor with a gross floor area of 5,250 square metres
C. Several technical buildings known as Balance of Power (BOP) comprising of Fire truck station, black start diesel generator building (BSDG), Service air compressor building, fuel gas station, emergency diesel generator building (EDG) and pump water house
d. Other associated infrastructure comprising of several manholes, cable trenches, drainage channels and asphaltic road network
e. Associated electro-mechanical works for all the buildings named above
f. Interacted and gave attendance to nominated steel fabrication subcontractors as well as equipment installation subcontractors
Peculiarity of Project Location: The project is located in an existing power station at Ogorode road, Sapele and next to the Ethiope River.